Info room

On this page:

Cape Horn Interchange Improvements Open House

Colony Farm Tidal Flow Restoration and Habitat Enhancement Project - Open House

Birdland/Guildford - Local Area Consultation

Cape Horn - Local Area Consultation Information

January 2010 Kiewit / Flatiron Preconstruction Inspection Survey Reminder

Fraser Heights West - Local Area Consultation Information

Manor Street - Local Area Consultation Information

Birdland - Local Area Consultation Information

Community Relations Information

Community Updates

Project Fact Sheets

Pre-design Concepts

Pre-design Consultation Materials Archive

 

Cape Horn Interchange Improvements Open House

On May 18, 2010, a open house was held for members of the public to hear more about the new Highway 1/Cape Horn Interchange, which is currently under construction as part of the Port Mann/Highway 1 (PMH1) Improvement Project.

Please click on the link below to view information about the Cape Horn area improvements.

Discussion Guide

 

____________________________________________________________________

Colony Farm Tidal Flow Restoration and Habitat Enhancement Project - Open House

The Colony Farm Tidal Flow Restoration and Habitat Enhancement Project is part of the Port Mann/Highway 1 (PMH1) Improvement Project and the work includes habitat and water management improvements at Wilson Farm, and area within Colony Farm Regional Park.  There has been extensive consultation over a two-year period, which provided important input that has been used to refine the proposed design for tidal flow restoration and habitat improvements at Wilson Farm.  Consultation for this project started in March 2008 and has included multiple stakeholder groups as well as the public.  The following is a report with a summary of the consultation process, design refinements and feedback and the related Appendices.

Consultation Report - Updated June 8

Appendices - Updated June 8

 

____________________________________________________________________

Birdland/Guildford (including Robin Crescent, Pheasant Drive, Hummingbird Place, Flamingo Place and 152 Street to 108 Avenue) - Local Area Consultation

From March 24, 2010 to March 31, 2010, a local area consultation will be held for Birdland/Guildford residents along Highway 1 in Surrey.  The purpose is to provide local residents with current information about PMH1 Improvements and to consult on design features such as noise walls and finishing options.  Local area consultation for other sections of the highway will be undertaken as the project progresses.  Notices will be posted to this website and mailed to local area residents and businesses as appropriate.

Update: April 1, 2010 - The Birdland/Guildford local area consultation is now closed. A consultation summary report and input considerations memo will be provided to the attendees and posted to the website when it becomes available.

Discussion Guide and Feedback Form

Display Boards

 

____________________________________________________________________

Cape Horn - Local Area Consultation

From January 28 to February 4, 2010, local area consultation is being held for Cape Horn residents in Coquitlam.  The purpose is to provide local area residents with current information about PMH1 Improvements and to consult on design features such as noise walls, berms and landscaping options.  Local area consultation for other sections of the highway will be undertaken as the project progresses. Notices will be posted to this website and mailed to local area residents and businesses as appropriate.

Update: March 19, 2010 - Please see below for the Cape Horn Consultation Summary Report.  The Project's Interim Input Considerations Memo will be posted when it becomes available.

Discussion Guide and Feedback Form

Display Boards

Cape Horn Consultation Summary Report

 

____________________________________________________________________

Fraser Heights West - Local Area Consultation

From December 9 to December 16, 2009, local area consultation was held for the Fraser Heights West area of Surrey.  The purpose was to provide local area residents with current information about Port Mann/Highway 1 Improvements and to consult on design features such as noise walls and landscaping options.  Local area consultation for other sections of the highway will be undertaken as the project progresses.  Notices will be posted to this website and mailed to local area residents and businesses as appropriate.

Update: Please see below for the Fraser Heights West Consultation Summary Report and the Project's Input Considerations Memo.

Fraser Heights West Open House Advertisement

Discussion Guide

Project Update

Display Boards

Fraser Heights West Consultation Summary Report

Fraser Heights West Input Considerations Memo

 

____________________________________________________________________

Manor Street - Local Area Consultation

From October 28 to November 4, 2009, local area consultation was held for Manor Street between Wayburne Drive and Douglas Road in Burnaby.  The purpose was to provide local area residents with current information about PMH1 Improvements and to consult on design features such as noise walls and landscaping options.  Local area consultation for other sections of the highway will be undertaken as the project progresses. Notices will be posted to this website and mailed to local area residents and businesses as appropriate.

Update: February 5, 2010 - Please see below for the Manor Street Consultation Summary Report.  The Project's Interim Input Considerations Memo will be posted when it comes available.

Discussion Guide

Display Boards

Manor Street Consultation Summary Report

____________________________________________________________________

Birdland - Local Area Consultation

From September 10 to 17, 2009, local area consultation was held for the Birdland area of Surrey. The purpose was to consult with local residents on design features such as retaining wall finishes and landscaping options that will be constructed in Birdland. Local area consultation for other sections of the highway will be undertaken as the project progresses.  Notices will be posted to this website and mailed to local area residents and businesses as appropriate.

Update:  November 16, 2009 - Please see below for the Consultation Summary Report and the Project's Interim Input Considerations Memo.

Discussion Guide

Display Boards

Birdland Local Area Consultation - Interim Input Considerations Memo

Birdland Local Area Consultation Summary Report

____________________________________________________________________

Community Relations

The Port Mann/Highway 1 Improvement (PMH1) Project has an ongoing community relations program to ensure that residents, municipalities and other key stakeholders are informed of upcoming construction activities. As part of the program, we will be distributing Community Updates on a regular basis as well as attending community events in local municipalities.

If you have any questions, or if you would like to be added to our distribution list to receive community updates, please use the contact information below:

Phone (24 hours, toll free): 1-866-999-PMH1 (7641)
Email: info@pmh1project.com
Website: www.pmh1project.com

Environmental Update

Environmental Update - February 2010 PDF, 3 MB

 

Project Fact Sheets

Project Fact Sheet - September 2009 PDF, 1 MB
Project Fact Sheet - Tolling Framework and Pricing PDF, 1 MB

 

Community Updates

Community Update - July 2009 PDF, 408 KB

 

Construction Updates

Port Mann Bridge Construction Update PDF, 3 MB

 

 

____________________________________________________________________

 Pre-Design Concepts

The following Port Mann/Highway 1 Improvement (PMH1) Project pre-design concepts were submitted as part of the project's environmental assessment application in 2007 and received environmental assessment certification in July 2008.  Detailed designs are currently being developed and will be posted in the new year (2010).

Cassiar Tunnel PDF, 3,255 KB
1st Avenue PDF, 3,521 KB
Grandview Highway-Willingdon Avenue PDF, 3,604 KB

Douglas Road

Note: Wayburne Drive Overpass is no longer part of the project scope.

PDF, 3,437 KB
Sprott/Kensington Interchange PDF, 3,031 KB
East of Kensington PDF, 3,300 KB
West of Gaglardi Way PDF, 3,529 KB
Gaglardi Way Interchange PDF, 3,674 KB
Brunette Interchange PDF, 4,909 KB

King Edward Street Overpass

For more information on the King Edward Overpass, click here to view the City of Coquitlam website.

PDF, 3,497 KB
Cape Horn Interchange PDF, 3,914 KB
Lougheed Highway-United Boulevard Connections PDF, 4,583 KB
Mary Hill Bypass Connections PDF, 4,212 KB

Port Mann Bridge

Note: As part of the competitive selection process, a new 10-lane bridge was proposed to replace the existing bridge and provide additional capacity for future growth.  The new bridge will be constructed in the same footprint as the original twin bridge concept. 

PDF, 3,747 KB
152nd Street Interchange PDF, 4,210 KB
160th Street Interchange PDF, 3,374 KB
East of 160th Street PDF, 3,044 KB
176th Street Interchange PDF, 3,816 KB
East of 176th Street PDF, 3,140 KB

192nd Street Interchange

Note: subject to discussions with the City of Surrey.

PDF, 3,470 KB
East of 192nd Street PDF, 3,400 KB
East of 202nd Street PDF, 3,485 KB

216th Street Interchange

Note: subject to discussions with the Township of Langley.

PDF, 3,362 KB
South Fraser Perimeter Road PDF, 1,611

 

____________________________________________________________________

Pre-Design Consultation Materials Archive

Since 2003, the Gateway Program (PMH1 Project) has engaged in extensive public, stakeholder and municipal consultation.  Consultation for the PMH1 Project has taken place in various settings; including one-on-one and small group meetings, open houses, committees and working groups, as well as feedback components on the project website.  Consultation results, along with technical and financial analyses, provided important input to project scope and design.

The following is a list of archived consultation materials:

 

Cape Horn and Brunette Avenue Interchange Improvements Pre-Design Consultation (December 2006 - January 2007)

Summary Report

PowerPoint Presentation - Brunette and Cape Horn

Brunette Information Sheet

Cape Horn Information Sheet

 

Phase 2 Pre-Design Consultation on Access and Interchange Improvements (September - November 2006)

Phase 2 Pre-Design Consultation Summary Report

Discussion Guide

Display Boards

Open House Schedule

 

Phase 1 Pre-Design Consultation (February to April 2006)

Phase 1 Pre-Design Consultation Summary Report

Public Notice

Discussion Guide

Display Boards